• 6 Mile reconstruction with shoulder widening, vertical and horizonal curve corrections, cement stabilized base and 6 inches of Superpave asphalt.
  • 2 Quad Barrel box culverts measuring over 250 and 180 feet in length
  • Concrete roundabout at the intersection of ND 22 and Hwy 73
  • Unique benched slope with geofabric to allow for 1.5:1 slope construction